Sharcon Monumental Sub Base Installation

You can download a PDF version of the fixing instructions (567kb)

Introduction

Our sub bases are designed for use with the 26.95mm Peg and Tube Anchor System. This single tube anchor system is accredited for the safe installation of marble and granite memorials up to 4 feet high. For memorials over 4 feet two tubes should be used.

The system comprises a stainless steel tube which is driven into the ground through the memorial foundation and any sub-base. A short, removable stainless steel peg inserted into both the anchoring tube and the memorial base completes the anchor system.

Features

Fixing a Memorial with a Peg and Tube Ground Anchor System.

Preparation Prior to Installation

Pre-drill a ground anchor hole in the centre of the memorial base under the headpiece. If a sub-base and/or foundation flag are to be used, drill corresponding ground anchor holes in these as well. See Table A for the relevant ground anchor hole and tube sizes.

Preparing the Foundation

If using a foundation flag, cut out the turf to the depth of the foundation flag and level the flag. If fixing on a pre-installed poured concrete beam or raft foundation, drill a hole in the foundation for the anchoring tube so that when the tube is inserted in the hole the wings at the top of the tube are flush with the surface of the foundation.

Installation

Drive the anchoring tube vertically through the foundation with a hammer. We suggest using a separate peg as a 'knocking in' peg to avoid distorting either the tube or the peg during the driving process. Ensure that the wings of the tube are flush with the upper surface of the foundation. If necessary, cut recesses in the foundation to accommodate the wings.

If fixing the base and plate separately either
(1) insert the peg into the top of the anchoring tube and lower the base over the peg using skids or wedges to ease it down; or
(2) fix the base to the flag in the normal manner making sure the anchoring hole in the base aligns with the anchoring tube (using a mandrill will help) and drop the peg through the base into the anchoring tube.

Complete the installation of the memorial as normal.

If installing a pre-assembled memorial such as one with the plate and base already bolted together, resin the peg into the NAMM hole in the base, drop the memorial onto skids placed on the foundation and ease down into place using skids or wedges. You will find it easier and safer to position the peg over the tube than to position the NAMM hole in the memorial base over the protruding peg in the anchoring tube.

Sub-Bases

If there is a sub-base between the foundation and the memorial base either:
(1) drive the anchoring tube through the sub-base and foundation, making sure there is a minimum 575mm of tube length below ground level, then fix as above; or
(2) use an extra-long peg which extends through the sub-base and 70mm into the memorial base.

Remedial Work

The 26.9mm system is accredited for use as an all-in-one safety dowel and anchoring system for remedial work. Drill a hole through the base 75mm into the plate. Wrap tape over the head of the peg and resin the peg into the base and headpiece. Follow installation procedures for a pre-assembled memorial.


All information on this page is subject to change without notice. Sharcon Monumental Limited accepts no liability for loss or injury arising from use of the information on this web site. Due to technical reasons, colours shown may not be reproduced accurately. All sizes shown are approximate. Prices exclude taxes. Prices exclude delivery.

For more information
or to order
Call 01388 776471
Fax 01388 776471
E-mail us
Online Enquiries

Associate Member and supplier to Members of the National Association of Memorial Masons

Associate Member and supplier to Members of the National Association of Memorial Masons

Table A
Maximum Hole Diameter (mm)Tube Diameter (mm)
28.026.9
30.028.6
40.038.0
Peg and tube fixing

Fixing Guide